Boise Cascade Plywood, Kettle Falls
Air Operating Permit renewal
June 12, 2024, 12 a.m. - July 18, 2024, 11:59 p.m.
We propose to approve the draft renewal of Boise Cascade Kettle Falls Plywood's air quality air operating permit (AOP).
Para asistencia en español: [email protected]
Boise Cascade Kettle Falls Plywood, in Stevens County, is a plywood plant with the following equipment:
- Hogged fuel boiler
- Fluidized bed combustor
- Maintenance shops
Documents for review
- Boise Cascade Kettle Falls Plywood draft air operating permit
- Boise Cascade Kettle Falls Plywood draft statement of basis
We determined this proposal satisfies the requirements of Chapter 173-401 WAC. We plan to approve the renewal.
To comment or request an online public hearing, use one of the ways listed below by July 18, 2024. A request for an online public hearing must include the interest of the person making the request and why a public hearing is needed. We will hold an online public hearing if there is significant public interest.
This notice was posted on June 12, 2024.
Background
Commercial and industrial businesses that emit large amounts of air pollution are required to get an air operating permit. An air operating permit is a master document that lists all of the air pollution requirements that apply to a business or industry. We issue these permits along with other clean air agencies in Washington.
Comment online
- Submit your comment by email: [email protected]
Comment by mail
Washington Department of Ecology Eastern Regional Office
4601 North Monroe Street
Spokane , WA 99205-1295
Questions
To request ADA accommodation, contact Ecology's ADA Coordinator by email at [email protected], or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY). More about our accessibility services.